Abstract:In this paper, a cost-benefit analysis based optimal planning model of battery energy storage system (BESS) in active distribution system (ADS) is established considering a new BESS operation strategy. Reliability improvement benefit of BESS is considered and a numerical calculation method based on expectation is proposed for simple and convenient calculation of system reliability improvement with BESS in planning phase. Decision variables include both configuration variables and operation strategy control variables. In order to prevent the interaction between two types of variables and enhance global search ability, intelligent single particle optimizer (ISPO) is adopted to optimize this model. Case studies on a modified IEEE benchmark system verified the performance of the proposed operation strategy and optimal planning model of BESS.